Urban land use plans in the process
Zoning Plan for the “Gemeindeallmende Industrial and Commercial Park”
the local community of Winnweiler, Alsenbrück-Langmeil district
Implementation of public and official participation in accordance with Section 3 (2) and Section 4 (2) BauGB
from June 15, 2026, through July 17, 2026
To download:
- Announcement
- Zoning Plan
- Textual stipulations
- Reason
- Environmental report
- Acoustic Analysis
- Species Conservation Assessment
- Drainage concept
- Statement on Transportation
- Study on the Potential for Industrial and Commercial Land (Kusel/Donnersberg District)
- Land Valuation in Donnersberg District
- Business Study: Winnweiler Municipal Association
- Consideration of early involvement of authorities and other public interest bodies pursuant to Section 4(1) of the Building Code (BauGB)
14. Consideration of early public participation pursuant to § 3(1) of the BauGB
Winnweiler, June 12, 2026
signed. Rudolf Jacob
Local mayor
Winnweiler, June 12, 2026
Municipal administration
signed. Rudolf Jacob
Mayor
2nd update of the land use plan
of the municipality of Winnweiler
Implementation of public and official participation in accordance with Section 3 (2) and Section 4 (2) BauGB
from 23.02.2026 up to and including 30.04.2026
To download:
- Announcement
- Plan drawing of the entire municipality
- Plan drawings of the individual local communities
- Legend of the plan drawing
- Justification Part A
- Explanatory Statement Part B - Environmental Report
- Attachments
- Overview for determining the threshold values
- Study on the establishment of regionally significant commercial areas
- Industrial and commercial site potential study - Inter-municipal study for the district of Kusel and the Donnersberg district
- Determination of potential areas for ground-mounted photovoltaic systems
- Study on the use of wind energy
- Overview plan of potential areas for renewable energy after consultation with the local municipalities
- Landscape plan of the municipality of Winnweiler
- Map 1 Erosion risk of agricultural land
- Map 2 Geology
- Map 3 Location typology
- Map 4 Water network - structural quality
- Map 5 Groundwater WFD
- Map 6 Today's potential natural vegetation
- Map 7 Climate
- Map 8 Landscape areas
- Map 9 Biotope types
- Map 10 Protected areas
- Map 11 Wildlife
- Map 12 Recreation - Leisure
- Map 13 Conflicts
- Map 14 Target and action areas
- Environmental comments from the procedures according to § 3 and § 4 BauGB
- Weighing up the early involvement of the public in accordance with Section 3 (1) BauGB and the authorities and other public bodies in accordance with Section 4 (1) BauGB
Winnweiler, 20.02.2026
Municipal administration
Mayor
signed. Rudolf Jacob
Project-related development plan "Nahversorgungsmarkt"
of the local municipality of Börrstadt
Early participation in accordance with Section 3 (1) and Section 4 (1) BauGB
from 26.01.2026 up to and including 27.02.2026
To download:
- Announcement
- Draft development plan
- Textual specifications with justification
- Drainage concept Text section
- Drainage concept Site plan
- Traffic report text section
- Traffic report Plans and attachments
Börrstadt, 23.01.2026
signed. Torsten Windecker
Local mayor
Winnweiler, 23.01.2026
Verbandsgemeindeverwaltung
signed. Rudolf Jacob
Mayor
